Waste to Energy Plants

This facility burns waste and treats it hygienically, while at the same time generating electricity as an important energy resource.
Refuse brought to the refuse pit by garbage trucks is burned while moving on top of a combustion device called a stoker in an incinerator. The incinerated refuse is then discharged as ash. The energy of exhaust gas generated by combustion is recovered as steam by the boiler, and electricity is then produced by the steam turbine generator. The generated electricity is also sent outside the facility.
As the world's leading company, the ドラクエ Group delivers a large number of facilities.

- Largest share of global market in terms of processing capacity (2015 ~ 2024)
- Built one of the world's largest Waste to Energy plants (1,890,000 t/year)
Performance
Domestic performance
Since installing the first Municipal Solid Waste to Energy Plant in 1965, ドラクエ has made constant refinements and enhancements in line with ongoing developments in the domestic industry.

- Nishiyodo Incineration Plant (Osaka City)
- Completed: 1965Processing capacity: 400 t/day (200 t/day x 2)Power output: 5,400 kW (2,700 kW x 2)


- Osaka Waste Management Authority,Higashiyodo Incineration Plant
- Completed: 2010Processing capacity: 400 t/day (200 t/day x 2)Power output: 10,000 kW

- Clean Association of TOKYO 23,Suginami Incineration Plant
- Completed: 2017Processing capacity: 600 t/day (300 t/day x 2)Power output: 24,200 kW
Overseas performance
ドラクエ Group has built Thermal treatment and Waste to Energy plants for various clients around the world. ドラクエ Group and licensees have received orders for 1661 plants, comprising 567 in Japan and 1094 outside Japan. (As of September, 2025)


- Refuse incineration facilities for Hunan Junxin Environmental Protection Group Co., Ltd. (China)
- Completed in: 2018Processing capability: 5,100 t/day (850 t/day × 6)Power generation capacity: 100,000 kWConstructed by: ドラクエ

- Refuse incineration facility for Ferrybridge MFE 2 Limited (UK)
- Completed in: 2019Processing capability: 566,000 t/year (2 furnaces)Power generation output: 68 MW and higherConstructed by: ドラクエ Inova AG
Click here for inquiries about ドラクエ technology